Construction of a dry bulk terminal

UAB "Malkų įlakos terminaras"

The specialists of UAB Ekobana successfully completed the third stage of construction of the dry bulk terminal and put the project into operation.

The third stage of construction of dry bulk terminal included the construction of new grain storage silos by connecting them to the existing system of the terminal through process lines.

THE FOLLOWING EQUIPMENT WAS SUPPLIED, INSTALLED, COMMISSIONED, AND PUT INTO OPERATION:

  • Grain storage silos (3 units, each 3500 t)
  • Belt conveyors (300 t/h capacity) and chain conveyors (400 t/h capacity).

The existing process equipment was adapted to the new equipment and electrical and automation works for the whole complex were performed.

The work was completed on time and to the full satisfaction of the client.

2014
year started
2014
year of project delivery
no
delay